- FondsASTANO - ASTANO
- SubfondsPETR - PETROLEROS
- SeriesSERIE M - NC 234 Texaco Spain NC 235 Texaco London NC 239 Tarragona NC 240 Texaco South America NC 241 Carthago Nova
- 264 more...
- Item180 - PISO EN CÁMARA DE BOMBAS. DISPOSICIÓN Y DETALLE = FLOOR PLATES IN PUMPS ROOM. ARRANGEMENT AND DETAILS
- Item181 - HIGH PRESSURE AND HIGH TEMPERATURE STEAM PIPING ARRANGEMENT FOR SPRING HANGES (PLATAFORM 12470 M)
- Item181 - HIGH PRESSURE AND HIGH TEMPERATURE STEAM PIPING ARRANGEMENT FOR SPRING HANGES (PLATAFORM 18560 M)
- Item181 - HIGH PRESSURE AND HIGH TEMPERATURE STEAM PIPING ARRANGEMENT FOR SPRING HANGES (LOWER FLOOR PLAN)
- Item181 - HIGH PRESSURE AND HIGH TEMPERATURE STEAM PIPING ARRANGEMENT FOR SPRING HANGES (SECTIONAL ELEVATION STARBOARD)
- Item181 - HIGH PRESSURE AND HIGH TEMPERATURE STEAM PIPING ARRANGEMENT FOR SPRING HANGES (SECTIONAL ELEVATION PORT)
- Item181 - HIGH PRESSURE AND HIGH TEMPERATURE STEAM PIPING ARRANGEMENT FOR SPRING HANGES (FR Nº 45 SECTION LOOKING AFT)
- Item181 - HIGH PRESSURE AND HIGH TEMPERATURE STEAM PIPING ARRANGEMENT FOR SPRING HANGES (FR Nº 45 SECTION LOOKING FORW)
- Item182 - MAIN STEAM - DIAGRAMMATIC ARRANGEMENT
- 298 more...